Also on the main page are several key performance indicators ( KPIs) displayed both bar style ( bottom left) and gauge style ( upper right). 主页上还有若干关键性能指标(KPIs),既有条形样式(左下角)又有标准规格样式(右上角)。
When the command launches, pv posts a progress bar and continually updates the gauge to show headway. 启动这个命令时,pv显示一个进度条并不断更新。
Aiming at the torsional vibration of a space flexible bar system, a flexible bar system which consists of a flexible bar, a strain gauge sensor and a piezoelectric torsional actuator is proposed. 针对空间柔性杆系统的扭转振动问题,提出了一类由柔性杆、电阻应变片传感器、压电扭转致动器组成的柔性杆系统。
The surface residual stress of tube and bar after drawing straightening and annealing, under different processing conditions, were measured by means of resistance strain gauge. 用电阻应变片法测试了管棒材拉拔、矫直和退火过程中产品表面残余应力,研究了管棒材残余应力随工艺参数变化的规律。
Determining the bearing capacity of the pile below a certain depth by the method combining loading test and steel bar gauge measurement 用载荷试验及钢筋计测试联合确定一定深度上的桩基承载力
Interpretation method for observational data of reinforcement bar stress gauge 钢筋计观测资料整理方法
A Bar Gauge Identification System Based on DSP 基于DSP的条码标尺识别系统研究
The most important part of the digital level is the bar gauge identification system. 条码标尺的识别系统是数字水准仪中最重要的组成部分。
The optimization of tension Hopkinson bar ( TSHB) tests has been studied. The structure and loading conditions of TSHB have evident influence on test results including the gauge length and geometry of specimen, interconnecting linkage, contact boundary, stress waves and so on. 研究了拉伸Hopkinson试验(TSHB)的优化问题:Hopkinson拉伸试验装置的结构及加载条件明显影响试验结果,其中包括试件的几何形状、试件与杆的连接以及接触边界、应力波的影响。
Taking reinforce bar stress gauge and concrete stress gauge to survey the change of raft reinforce bar and concrete stress, and taking thermometer to scale the raft concrete temperature to gain the influence of the heat of hydration. 利用钢筋应力计和混凝土应变计测量筏板钢筋和混凝土的应力、应变变化,同时用温度计测试筏板混凝土的温度,观测水化热的影响。
The pullout tests on the bonding specimens with the deformed reinforcing bar installed by the interior strain gauge are conducted, and the associate expression of bond between steel and concrete is introduced. 通过快速锈蚀内贴片变形钢筋混凝土试件的拔出试验,给出了钢筋与混凝土协同工作系数的表达式。